Home
page–Download
the data sheet–Contact
us
Technical
data sheet
Conditions
and technical needs depend of:
·the
kind of shadow projection method,
·the
place of the performance and its own technical possibilities,
·the
type of transport used by the company
These
conditions are to be defined on a case to case basis
Below
are described the different possibilities
1.Kind
of shadow projection
ØTypical
shadow projection : shadow
screen90cm by 60cm
Screen
inserted into a “castelet”(see
photo)
Dimensions of the castelet: width 2m50,
height 2m90, depth 2m50
Maximal audience: 150 to 200 people according the room disposition
First row: at 1m50 from the castelet
Set up time: 60 minutes – Dismantling time: 20 minutes
ØProjection
standard simplified :
shadow screen 90cm by 60cm
Screen
directly installed on a table (see
photo)
Dimensions: width 2m25, height 2m, depth 2m50
Maximal audience: 100 to 150 people according the room disposition
First row: at 1m from the screen
Set up time: 30 minutes – Dismantling time: 10 minutes
ØProjection
on extended screen :
shadow screen 180cm by 120cm écran
Screen
inserted into a “castelet”(see
photo)
Projection surface 4 times larger than the standard device (see
principle)
Dimensions of the castelet: width 4m,
height 3m, depth 3m
Maximal audience: 300 to 400 people according the room disposition
First row: at 2m50 from the screen
Set up time: 90 minutes – Dismantling time: 30 minutes
ØDirect
projection on any type of surface
Direct
shadow projection can be performed on any type of surface such as movies
screen,
façade (see
photo),
walls or even walls cave!
Shadow cast can then be very large
Maximal audience: no limit
Set up time: depend of the place configuration
2.Sound
system
ØUsing
of the company own sound system
If
the company can travel by car, we can use our own sound system, so we are
autonomous
ØUsing
of the performance room sound system
If
the company cannot travel by car (for
example when the travel is by plane)
or if the local sound system allows it, the company will use the organizer’s
system
The
company’s mixer table,
located on stage, will be connected to the local sound system under the
responsibility of the local technical manager
The
outputs of the company’s mixer table are Jack 6.35 or RCA connectors
3.Light
system
ØUsing
of the company own light system
If
the company can travel by car, we can use our own light system, so we are
autonomous
ØUsing
of the performance room light system
If
the company cannot travel by car (for
example when the travel is by plane)
or if the local light system allows it, the company will use the organizer’s
system
The castelet
should be illuminated with a set of front projectors with warm color filters
(yellow-orange). The setting of these lights is the responsibility of the
light manager of the place
If
a light remote console cannot be set on stage, the monitoring of the lights
should be conducted by the light manager of the place. Instructions will
be given directly on place
4.Technical
needs
ØObscurity
A
good obscurity is necessary in case of standard shadow cast, no light coming
from our back is allowed
An
absolute obscurity is necessary when the extended screen is used or in
case of direct projection on any type of surface
ØElectricity
Electrical
power 220V 16A
Standard
CEE 7/7 connector on
stage
ØFurniture
Tables
are necessary, 3 to 5 according their dimensions
A
ladder (3 or 5 steps)
ØCatering
Water
and snickers would be appreciated
5.Setting
and dismantling times
ØSetting
The
setting time depends of the type of projection chosen and if the local
sound and light system are used or not. To that we have to take into account
a time for relaxing. So the setting time can be from 30 minutes up to 2
hours
If
the travel is done by airplane, an additional time on 1 hour is necessary
to build the castelet
If
needed, most of the setting time can be done backstage if enough room is
available. The setting time on stage can be reduced to around 20 minutes
ØDismantling
The
dismantling time depends of the type of projection chosen and if the local
sound and light system are used or not. So this time can be from 10 minutes
up to 45 minutes
If
the travel is done by airplane, an additional time of 1 hour is necessary
to dismount the castelet and pack.
If
needed, most of the dismantling time can be done backstage if enough room
is available. The setting time on stage can be reduced to around 10 minutes